PKN ORLEN SA

Construction of Utilization of Liquid Deposits Unit

PL
Construction of double shell storage tank No 67 capacity 10.000 m3
PL
EN

Capacity expansion of BITUROX Plant - increasing of storage capacity and distribution system of asphalts

and

Extension of storage terminal No 74 in Ostrów Wielkopolski - 1st stage

PL
EN
Overhaul and modernization works of production facilities in the Production Plant in Płock
PL
EN

Construction of Fuel Terminal in Ostrów Wielkopolski:

Construction of three double-shell storage tanks Z-11, Z-12 & Z-13 capacity 10.000 m3 each

PL
Construction of double-shell storage tank No 41D capacity 10.000 m3
PL
Modernization of Crude Distillation Unit III
PL
EN

Construction of Fuel Terminal in Ostrów Wielkopolski:

Construction of three double-shell storage tanks Z-8, Z-9 & Z-10 capacity 10.000 m3 each.

PL
Constructions, repairs and modernizations of petrochemical and refinery installations in PKN ORLEN SA in Płock.
PL
EN
Construction of double-shell storage tanks No 15A, B, C capacity 9.600 m3 each
PL
Assembly, civil and painting works on Water Supply and Sewage Disposal Plant.
PL
EN

Develop of fuel storage and distribution infrastructure for Gasoline Octan Processing Plant and Oil Octan Processing Plant.

PL
EN

LOTOS GROUP SA

GENERAL CONTRACTING.

FUEL COMPLEX - SPRING SHUTDOWN 2009

PL (1)
PL (2)

FUEL COMPLEX - SPRING SHUTDOWN 2005

GENERAL CONTRACTING.

Extension of Fuel Complex production capacity

PL
EN

GENERAL CONTRACTING.

Construction of two storage tanks S-128 and S-129 with capacity of 20.000 m3 each for aircraft fuel and diesel oil.

PL 1/2
PL 2/2
EN
Heaters shifting on Unit 900
PL

AB MAZEIKIU NAFTA

Modernization of Fluid Catalytic Cracking Unit (Mazeikiai, Lithuania)

EN
PL

GAZ DE FRANCE / BENTINI S.p.A.

Construction of three LNG tanks with capacity of 110.000m3 (each) on Fos Cavaou Terminal in Fos-sur-Mer in France.

EN
PL

ANWIL SA
PROSYNCHEM / FLUOR DANIEL

Modernization of PVC Plant

PL
EN

PRZEDSIĘBIORSTWO EKSPLOATACJI RUROCIĄGÓW NAFTOWYCH "PRZYJAŹŃ" SA
(THE OIL PIPELINE OPERATION COMPANY "FRIENDSHIP")

GENERAL CONTRACTING

Construction of double-shell tank no 22 with capacity of 100.000 m3.

PL
EN

Modernization of fuel storage farms:

- Tank Farm Plebanka
- Storage Farm Gdańsk
- Pumping Station St-1 in Adamowo
- Pumping Station St-3 in Góry
- Pumping Station in Lignowy Szlacheckie
- Pumping Station in Łupowo

PL
EN
Repair of transfer pipelines (DN 500) in marsh area and passages under roads.
PL
EN
Modernization of Pumping Station in Lignowy Szlacheckie
PL
EN

OPERATOR LOGISTYCZNY PALIW PŁYNNYCH SP. Z O.O.
(LOGISTIC OPERATOR OF LIQUID FUELS)

GENERAL CONTRACTING.

Construction of tank capacity 32.000 m3 (double shell, double bottom, fixed roof, complete anticorrosion protection, documentation elaboration).

PL

GENERAL CONTRACTING

1. Erection of storage tank capacity 32.000 m3 in Fuel Base No 2 in Nowa Wieś Wielka.
2. Reconstruction and expansion of fire fighting system in Fuel Base No 10 in Kawice.

PL 1/2
PL 2/2
EN

OFFICINE MARALDI BERTINORO S.p.A

Construction of double-shell Cryogenic Ethylene Storage Tank 8000 m3

EN
PL

PRZEDSIĘBIORSTWO PRZEŁADUNKU PALIW PŁYNNYCH "NAFTOPORT" SP. Z O.O.
(LIQUID FUEL TRANSSHIPMENT ENTERPRISE "NAFTOPORT")

Construction of VRU Unit

PL
EN

DUO

GENERAL CONTRACTING.

Extension of Fuel Storage Terminal in Stobno near Szczecin.

PL
EN

SNAMPROGETTI

Construction of Vacuum Residue Upgrading Plant (Płock)

EN
PL

M.W. KELLOGG COMPANY

Modernization of Fluid Catalytic Cracking II Unit (Płock)

EN + PL
© 2008 NAFTOREMONT
All rights reserved.
Lumena-Park Sp. z o.o