CLIENT:
OIL PIPELINES OPERATION ENTERPRISE "FRIENDSHIP" SA
(PERN "PRZYJAŹŃ" SA)
General Managing of tank No 22 (capacity 100.000 m3) in ST-1 Adamowo
SCOPE OF WORKS:
- supply and erection of steel components for double shell type tank (capacity 100.000 m3) with floating roof,
double monitored bottom,
tank piping and access steel structures (3.150 t),
- supply and erection of transfer pipelines (70 t),
- anticorrosion protection of outer shell,
dome roof and piping,
- non destructive examinations,
- hydrotest,
- supply and erection of fire fighting system (foam and spraying - 59 t),
- construction of water sewage system (30 t),
- construction of concrete foundations of the tank,
- construction of concrete retention tank,
- construction of concrete fire fighting tank,
- construction of concrete gate valve chambers,
- construction of fire-fighting stands,
- supply and assembly of electrical switch boards,
- supply and assembly of electrical system,
- supply and assembly of cathodes system,
- supply and assembly of automatic systems and measurement system,
- construction of access roads and yards,
- surveying with "as-built" inventory control
TERM OF PROJECT EXECUTION:
11.2002 - 09.2004
|