 CLIENT:
AB MAZEIKIU NAFTA
SCOPE OF WORKS:
Revamp of the reactor,
stripper,
riser,
air coolers,
column pumps and heat exchangers completed performed within a 30 day scheduled shut down.
The reactor head,
with the diameter of 8m and weight of 127t being was removed and subsequently replaced with a new one,
which was prefabricated at site in Mazeikiu Nafta Refinery.
TERM OF PROJECT EXECUTION:
02.2003 - 06.2003
|