CLIENT:
LOTOS GROUP SA
SCOPE OF WORKS:
Unit 900
Shifting,
assembly and start-up of new vacuum heater in place of old one.
A huge 500 t construction rising over an 8-story building was assembled 50 m from place of destination.
Unusual accuracy of assembling consisted in fit-up on the new heater to existing installations and tie-in pipeline systems.
The old heater was disconnected,
lifted in whole and shifted.
In its place a new one was transported on special rails.
Sections and elements of new heater were prefabricated in Plock.
TERM OF PROJECT EXECUTION:
1999
|