CLIENT:
EUROPORT GDAŃSK
/ S.C.I.
Infrastructure
SCOPE OF WORKS:
Fodder storage building 163m x 55m x 35m overall dimensions in Gdansk Europort
- Prefabrication and erection of the steel construction (1280t),
erection of rafter framing of hipped roof end with trapezoid sheeting and installation of accompanying facilities: belt conveyors,
rolled up doors,
smoke vents,
sprinkler systems.
- Prefabrication has been made in Plock.
Structure frames ready for assembly loaded on barges were floated by Vistula River directly to assembly yards.
TERM OF PROJECT EXECUTION:
1999
|